Old Central Fire Station, 25 Murray Street, Perth
Heritage · Perth, Western Australia

Old Central Fire Station25 Murray Street, Perth

Reading the fabric of one of Perth’s significant civic places through conservation, investigation and repair.

Project overview

Heritage conservation safeguards more than buildings.

Old Central Fire Station heritage fabric detail

It preserves the material evidence, craftsmanship and shared memory through which a city understands itself.

The Old Central Fire Station is one of Perth’s significant civic places. Its sandstone walls, terracotta tiled roofs, timber verandahs, decorative work and Federation character form part of a remarkably intact heritage building whose significance extends well beyond its physical fabric.

Dezine ID’s work focused on the conservation assessment of a deteriorated balcony timber post, capital moulding and associated building-envelope interfaces, with the investigation extending into roof drainage, flashing, masonry and concealed timber conditions.

Location25 Murray Street, Perth WA
PlaceOld Central Fire Station / former No. 1 Fire Station
Heritage statusState Register of Heritage Places
ScopeHeritage conservation assessment, defect investigation, remediation methodology and documentation
FrameworkHeritage Act 2018 (WA), No. 1 Fire Station Conservation Plan (2006), Burra Charter principles
Dezine ID heritage conservation study for the Old Central Fire Station
Conservation response

Understand first. Intervene second.

Conservation work at a place of this significance requires a different mindset from conventional repair.

A deteriorated timber member, cracked element, displaced roof tile or failing junction cannot be considered in isolation. Each condition must be understood in relation to the history of the place, original construction, later interventions and the cause of deterioration.

The Conservation Plan therefore becomes an active working document, guiding what should be retained, repaired, strengthened or, only where necessary, replaced.

Conservation in practice

Observe · record · diagnose · conserve.

01

Understand significance

Establish what matters, what fabric carries significance and why it should be retained.

02

Investigate the fabric

Opening-up and close inspection reveal concealed decay, failed junctions, moisture paths and previous interventions.

03

Diagnose the cause

Respond to causes rather than appearances, particularly water movement, drainage and material failure.

04

Minimum necessary intervention

Retain significant fabric wherever practicable, repair locally and replace only where deterioration is beyond reasonable repair.

05

Record the work

Document what was found, why decisions were made and what intervention occurred for future custodians.

Condition investigation

Looking beyond the surface.

The investigation identified that deterioration to the timber post tenon was unlikely to be an isolated timber failure. Evidence indicated long-term moisture ingress associated with adjacent valley guttering, flashings and concealed roof drainage interfaces.

Old Central Fire Station heritage facade detail
PRINCIPAL HERITAGE FABRIC · SANDSTONE, TIMBER VERANDAH AND DECORATIVE WORK
Old Central Fire Station turret and balcony detail
EXISTING FABRIC · TURRET, VERANDAH AND MASONRY INTERFACE
Balcony post and temporary support
BALCONY POST · EXISTING INTERVENTION AND TEMPORARY SUPPORT
Failed capital and beam interface
FAILED CAPITAL INTERFACE · DETERIORATED TIMBER CONNECTION
Advanced timber decay
ADVANCED TIMBER DECAY · LOSS OF SECTION AND FIBRE BREAKDOWN
Roof and masonry junction
ROOF JUNCTION · CONCEALED DRAINAGE AND MASONRY INTERFACE
Exposed roof and flashing interface
ROOF / FLASHING INTERFACE · OPENING-UP INVESTIGATION
Weathered roof junction
WEATHERED JUNCTION · EVIDENCE OF MOVEMENT AND DETERIORATION

The report concluded that the timber deterioration should be regarded as a consequence of building-envelope failure rather than the primary defect, making rectification of moisture ingress the first conservation priority.

Technical resolution

Repair before replacement.

The preferred heritage outcome is conservation repair of existing significant timber fabric wherever sufficient sound material remains.

Where detailed investigation confirms deterioration beyond practical repair, like-for-like reconstruction may be appropriate using matching timber species, replicated mouldings and traditional detailing.

Remediation methodology

Address the source before the symptom.

Temporary support at balcony post
01 Record and stabilise
Advanced timber deterioration at post
02 Open up and assess
Defective capital and beam junction
03 Rectify moisture pathways
Roof junction and masonry interface
04 Repair significant fabric
Conservation outcome

A process of judgement, not cosmetic renewal.

Good conservation allows a place to continue its life while retaining the material, workmanship, evidence and stories that give it significance.

  • Eliminate moisture ingress before timber works
  • Retain original fabric wherever practicable
  • Repair before replacement
  • Use compatible materials and methods
  • Reconstruct like-for-like only where required
  • Photographically record all stages of work
“Understand first, intervene second.”